Step C1: Designing Operational Autonomy
Purpose The best way to absorb variety, i.e. to deal with challenges and surprises is done locally. Interventions should be
Part of a larger Story
Purpose The best way to absorb variety, i.e. to deal with challenges and surprises is done locally. Interventions should be
Purpose Review Systems two and three. Check if they are adequate or what needs to be done to improve their
Step C2: Review Operational and Environmental Interactions Read More »
Purpose Ensure stability through a combination of horizontal synchronization and the necessary minimum of centralized management Abstract Tasks C3.1 Maximize
Purpose Create information systems which are capable to provide real time information loops Abstract A good information system, providing up-to-date
Purpose Deal with observed and future changes in the environment Abstract There is no point in having a superbly organized
Step C5: Design the Balance with the External Environment Read More »
Purpose To select a unit as the System-in-Focus and clarify its boundaries. Abstract The VSM is a recursive model, i.e.
Purpose To specify those parts of the system-in-focus which undertake System One (primary) activities. Abstract The system is what it
Purpose To identify those parts of the System-in-Focus that ensure that the Operational units interact in a stable manner. Abstract
Step A3: System Two, Stability and conflict resolution Read More »
Purpose To identify the relations between the organization as a whole and its units, i.e. Systems One. Deal with aspects
Purpose To identify those parts of the System-in-Focus that are concerned with future plans and strategies in the context of